United Security Products AVD-45c Manuale Pagina 52

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 51
38 UDC 6300 Process Controller Product Manual 1/03
3.7 Tuning L2 Parameters Set Up Group (Cascade or 2
Loop),
Continued
Function prompts
(continued)
Table 3-4 Tuning Group Function Prompts, continued
Function Prompt
Lower Display
Function
Name
Selections or
Range of Setting
Upper Display
Factory
Setting
PVEU VAL7
PV7 Value for Gain
Scheduling
PV value within the PV limits.
In Engineering units
0
PVEU VAL8
PV8 Value for Gain
Scheduling
PV value within the PV limits.
In Engineering units
0
GAIN VAL1 *
Gain 1 Value for Gain
Scheduling
0.001 to 1000
1.0
GAIN VAL2 *
Gain 2 Value for Gain
Scheduling
0.001 to 1000 1.0
GAIN VAL3 *
Gain 3 Value for Gain
Scheduling
0.001 to 1000 1.0
GAIN VAL4 *
Gain 4 Value for Gain
Scheduling
0.001 to 1000 1.0
GAIN VAL5 *
Gain 5 Value for Gain
Scheduling
0.001 to 1000 1.0
GAIN VAL6 *
Gain 6 Value for Gain
Scheduling
0.001 to 1000 1.0
GAIN VAL7 *
Gain 7 Value for Gain
Scheduling
0.001 to 1000 1.0
GAIN VAL8 *
Gain 8 Value for Gain
Scheduling
0.001 to 1000 1.0
*
ATTENTION
If units of percent proportional band (PB) are selected under Set Up prompt "CONTROL", function
prompt "PB or GAIN, these values displayed are in %PB, but the lower display will still show Gain.
Vedere la pagina 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 301 302

Commenti su questo manuale

Nessun commento